prj-tun-fab-complete2

Nawara, Tunisia, 20mmscfd Refrigeration Plant, Purchased
Awarded: March 2018 - Completed: December 2018 (In-Progress)
Estimated Total Project Value U$D4,500,000

Project Summary
Natgas provided all project management, engineering design, fabrication, installation assistance and commissioining for a complete modular 20mmscfd Propane Refrigerationn Plant to be install at Nawara, Tunisia. Our experience project team and our technical personnel had executed projects in this geographic location in Tunisia in the past and were well aware of the region and its challenges.

Equipment & Services Provided

  • 20mmscfd refrigeration plant with chiller & cold separator skids
  • PLC control panel, EG injection & gas-gas exchanger skids
  • Prefabricated off skid piping and off skid valves & instruments
  • Project & construction management
  • Commissioning, start up, training, 1-year spare parts

nigeria4

Oued Zar, Nigeria, Phase-1, Re-engineer & Design, Install & Commission Existing 100mmscfd LPG Cryogenics Plant
Awarded: February 2017 - Completed: March 2019 (In-Progress)
Estimated Total Project Value U$D20,000,000

Project Summary

In early 2017 Natgas was awarded Phase-1 of the Oued Zar project, which involved the re-engineering & design of the existing 100mmscfd LPG Cryogenics Plant that was never installed and laid in storage at location for two years. Modifications had to be made for additional flow rates and also to complete the installation and commissioning. In late 2017 Natgas won Phase-2, which was the procurement of all the additional Low Pressure, Intermediate Pressure and High Pressure compression now needed, totaling 35,000HP.

Equipment & Services Provided

  • Project & construction management of the local contractor working for our customer.
  • Clean inspect & refurbish if needed, existing equipment including; compression, process piping, towers & vessels.
  • Install all additional PLC controls, instrumentation and  programming in new control room and MCC.
  • Install all equipment and modules of the plant
  • Commissioning, start up, training
  • Procurement of commissioning and operating spare parts
ng-comp-fab-lpg

Oued Zar, Nigeria, Phase-2, Procurement of 35,0000HP Compression for LPG Plant
Awarded: October 2017ompleted: March 2019 (In-Progress)
Estimated Total Project Value U$D54,000,000

Project Summary

In late 2017 Natgas won Phase-2, which was the procurement of all the additional Low Pressure, Intermediate Pressure and High Pressure compression now needed, totaling 35,000HP.

Equipment & Services Provided

  • New Compression Packages Totaling 35,000HP these model combinations;
  •  Cat G3616-Ariel JGB4, Cat G3516-Ariel JGT4 & Cat G3512-Frick Screw HP, IP & LP Compressor Packages
  • New Murphy Controls Panel with Centurion Controller and Touch Screen
  • Assist with installation and commissioning of package.
  • Provide 2-Year Recommended Spare Parts